PROJECTS

Hotel TEMBO Barcelona

Reliable control solutions for sophisticated operations.

The hotel sector, the driving force of our country's economy, is undergoing a digital transformation and is under strict sustainability compliance requirements.

Competition is global, as are its customers. Furthermore, the establishment must adapt to multicultural demands and multiple services.

For this project, delivered in 2024, a control panel was standardized for each of the 17 floors. A dedicated control network, dedicated to the building's own control, controls approximately 2,500 physical points and nearly 9,000 integrated points from other systems. This network controls the climate of the 280 rooms and common areas, integrating 5,000 lighting points and all energy measurements. Separately in the basement and also connected to the grid, two substations manage the DHW and HVAC supplies, sourced from the heating and cooling network of Barcelona's 22@ district.

DATACENTER

ASI provides complete solutions, from the installation and commissioning of field elements, controllers, and specific software for critical installations such as data centers.

This facility is a 9MW data center built to international quality standards and for a single user. It covers 20,000 m2, with two levels and 2,000 m2 of server space, three service buildings, and one office building. It comprises a total of 3,000 physical points and more than 6,000 integration points.

The entire project was completed in one year, and control was commissioned four months after the installation start date.
The key to success is planning the needs in advance and ensuring proper documentation for integration with equipment from other suppliers.

Delivered by the end of 2024.

Developed Projects

Mobirise Website Builder


Campus of the University of Vic, UVIC (Catalonia)

· University campus.
· WebCTRL-Scada located in the corporate data center.
· Controlled atmosphere in laboratories.
· IAQ (Temp/H%/CO2/VOC).
· Energy management.

Mobirise Website Builder


Hotel Hampton by Hilton (Barcelona)

·240 room hotel
·WebCtrl v7
·Touch Screen HDMi
·1u. OFBBC + FIOs
· 40 us. Belimo immersion sensors
· 2 us. Danfos thermal meters

Mobirise Website Builder


Temperature control of the logistics facility

· Logistics platform in Tarragona, 53,000 m²
· HVAC control (chiller-boiler)
· 56 control and monitoring terminal units
· Redundant environmental sensors: working conditions
POH monitoring.

Mobirise Website Builder


IAQ Project and Energy Monitoring

· 5,600 m2 office building divided into 14 different tenants - Sant Just (BARCELONA)
· HVAC production performance monitoring
· Utility compensation and energy management
· IAQ (Temp/H%/CO2/VOC)

Mobirise Website Builder

Pharmaceutical project

· CR21-compliant project for a 20,000 m² area
· Validated temperature and humidity sensors
· Integration of Daikin and Atlas Copco
· Integration of legacy Honeywell system not validated
· Completion of global IT hosting system (US standard)